A Constraint Programming Approach To A Real-World Workforce Scheduling Problem For Multi-Manned Assembly Lines With Sequence-Dependent Setup Times

Show simple item record

dc.contributor.author Güner, Funda
dc.contributor.author Görür, Abduel K.
dc.contributor.author Satır, Benhür
dc.contributor.author Kandiller, Levent
dc.contributor.author Drake, John H.
dc.date.accessioned 2023-11-14T07:32:47Z
dc.date.available 2023-11-14T07:32:47Z
dc.date.issued 2023-07
dc.identifier.citation Güner, Funda...et al. (2023). "A Constraint Programming Approach To A Real-World Workforce Scheduling Problem For Multi-Manned Assembly Lines With Sequence-Dependent Setup Times", International Journal Of Production Research. tr_TR
dc.identifier.issn 0020-7543
dc.identifier.uri http://hdl.handle.net/20.500.12416/6559
dc.description.abstract For over five decades, researchers have presented various assembly line problems. Recently, assembly lines with multiple workers at each workstation have become very common in the literature. These lines are often found in the manufacturing of large vehicles, where workers at a workstation may perform their assigned tasks at the same time. Most research on multi-manned assembly lines focuses on balancing tasks and workers among workstations and scheduling tasks for workers. This study, however, concentrates on assigning tasks to workers already assigned to a specific workstation, rather than balancing the entire line. The problem was identified through an industrial case study at a large vehicle manufacturing company. The study presents two methods, one using mixed integer linear programming and the other using constraint programming, to minimise the number of workers required on a multi-manned assembly line with sequence-dependent setup times. The results of the computational experiments indicate that the constraint programming method performs better than the mixed integer linear programming method on several modified benchmark instances from the literature. The constraint programming model is also tested on the real-world scenario of our industrial case study and leads to significant improvements in the productivity of the workstations. tr_TR
dc.language.iso eng tr_TR
dc.rights info:eu-repo/semantics/closedAccess tr_TR
dc.subject Workforce Scheduling tr_TR
dc.subject Multi-Manned Assembly Line tr_TR
dc.subject Constraint Programming tr_TR
dc.subject Sequence-Dependent Setup Times tr_TR
dc.subject Mixed Integer Linear Programming tr_TR
dc.title A Constraint Programming Approach To A Real-World Workforce Scheduling Problem For Multi-Manned Assembly Lines With Sequence-Dependent Setup Times tr_TR
dc.type article tr_TR
dc.relation.journal International Journal Of Production Research tr_TR
dc.contributor.authorID 54700 tr_TR
dc.contributor.department Çankaya Üniversitesi, Mühendislik Fakültesi, Yazılım Mühendisliği Bölümü tr_TR


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record